PT DSS KARAWANG 1
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. DSS Karawang 1 (member of APP-Sinar Mas Group) is coal power plant which supply electricity to Pindo Deli (paper mills plant) around 30MW, syncronizing between power plant and PLN to be done through power transformer 3 x 50MVA, 70/20kV
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
-
Transient stability and load sheeding studies to assess system responses to events such as fault disturbances, generation trips / start up etc.
-
Harmonic studies to asses harmonic distortion levels and penetration and effectiveness of any potential mitigation measures
|
2
|
Rimau Electric
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. Rimau Electric is owner of coal power plant at tamiyang Kalimantan Tengah which supply electricity to PLN 2 x 3.5MW, synchronizing with PLN at 20kV feeder
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
|
3
|
PT Indokomas Buana Perkasa
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. Indokomas is contractor of coal power plant 2 x 7MW at Berau Kalimantan Timur which supply electricity to PLN, synchronizing with PLN at 20kV
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
|
4
|
PT Arena Maju Bersama
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT Arena is owner of coal bed methane genset power plant 10 x 700kW at Tayan-West Kalimantan which supply electricity to PLN, synchronizing with PLN at 20kV
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
|
5
|
PT Bayu Bumi Gemilang
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. Bayu Bumi Gemilang is owner of gas engine power plant which supply electricity to PLN and Industrial customer at Belimbing Bontang, 4 x 2MW, synchronizing with PLN at 20kV
|
-
Protection studies to determine protective device settings to achieve coordination
-
Transient stability and load sheeding studies to assess system responses to events such as fault disturbances, generation trips / start up etc.
|
6
|
PT Bayu Bumi Gemilang
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. Bayu Bumi Gemilang is owner of gas engine power plant which supply electricity to Industrial customer at Gresik, 4 x 2MW, synchronizing with PLN at 20kV feeder
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Power Quality Investigation, including measurement and analysis of harmonic distortion, voltage flicker, voltage dip; Demand (real, reactive, pf etc); transient short circuit.
|
7
|
PT Garuda Maintenance Facility
|
Power System Study
|
-
Power Quality Investigation, including measurement and analysis of harmonic distortion, voltage flicker, voltage dip; Demand (real, reactive, pf etc); transient short circuit.
|
|
|
PT Garuda indonesia facility is owner of maintenance facility is owner of maintenance facility of air plane at Cengkareng Soekarno Hatta airport, the distribution system using medium voltage system 20kV from PLN
|
-
Assessment, design and specification of remedial measure to improve power quality, transient performance etc.
|
8
|
PT Hasta Prajatama
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. Hasta Prajatama is contractor of mycrohidro powerplant 3 x 3MW at Cilaki 2 West Java which supply electricity to PLN, synchronizing with PLN at 20kV feeder
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
|
9
|
PT Bina Guna Kimia
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. Bina Guna kimia (FMC group) is owner of fertilize plant at semarang central java, the plant distribution system (1MVA) using medium voltage system 20kV from PLN, and low voltage 400V system
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
-
Power Quality Investigation, including measurement and analysis of harmonic distortion, voltage flicker, voltage dip; Demand (real, reactive, pf etc); transient short circuit.
-
Assessment, design and specification of remedial measure to improve power quality, transient performance etc.
-
Measurement of the local soil resistivite caracteristic for substation and generation protection
-
Design and specification of generation and substation earthing system to meet electrical and lightning protection system requirement and produce safe step and touch potential
-
Measurement of impedance of installed earthing system
|
10
|
PT Indo Korsa
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
|
|
|
PT Indo Korsa is owner of tire plant at citereup west java, the plant distribution system (20MVA) using meium voltage
|
-
Motor Starting Studies
|
11
|
PT ASUKA Engineering Indonesia
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
PT. Hasta Prajatama is contractor of oxygen plant at cilegon west java which have power distribution around 40MVA, Using 11kV and 400V power distribution
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
-
Motor Starting Studies
|
12
|
AKUO Energi Indonesia
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
Akuo Energy Indonesia as a leading company in renewable energy technology industry is planning to interconnect its generated electricity from the Solar PV Power Plant to the national grid (PLN).
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
-
Protection studies to determine protective device settings to achieve coordination
-
Transient stability and load sheeding studies to assess system responses to events such as fault disturbances, generation trips / start up etc.
|
13
|
PT ASUKA Engineering Indonesia
|
Power System Study
|
-
Load flow studies to asses equipment rating and loading, voltage profile, losses etc.
|
|
|
Power assessment in PT Cargill Serang Plant
|
-
Fault level studies to, short circuit current levels and flows to asses equipment capabilities and undertake protection co-ordination studies.
|
14
|
Suveiyor Indonesia
|
Power System Study
|
-
Grounding Grid Study
|
|
|
PT Antam 2 x 30 MW CFPP Antam Pomalaa
|
|
15
|
PT ASUKA Engineering Indonesia
|
PT Holcim
|
Testing and calibration protection relay and KWh meter
|
16
|
PT Industira
|
PLTMH Cirompang
|
Design and manufacturing neutral grounding Transformers
|
17
|
PT Indokomas Buana Perkasa
|
PLTU Berau
|
Design and manufacturing neutral grounding Transformers
|
18
|
PT Cyma Engineering Indonesia
|
|
LV main distribution and lighting panel
|
19
|
Sinohydro
|
PLTA Jatigede
|
Manufacture lighting pole and transmission pole installation
|
20
|
PT Navitas
|
|
Design and manufacturing neutral grounding Resistor
|
21
|
PT. SINAR BAHANA MULYA
|
CITRA GREND CIPUTRA GROUP
|
Installation cable gardu LNK AND SUPLAY KABEL
|
22
|
PT. ELEKTRINDO UTAMA INDONESIA
|
SIEMENS
|
Power Study and Relay Coordination Report
|
23
|
PT. BBRI
|
PT. BBRI
|
Maintenane MCC, Switchgear and motor
|
24
|
PT. SECAR TECHNO
|
PT. SECAR TECHNO
|
Maintenance Magnetblast Breaker
|
25
|
PT. WIJAYA KARYA
|
Power System Study
|
|
26
|
PT.Arena Maju Bersama
|
PLTGB TAYAN Kalimantan Barat 9 x 1000 KVA
|
Outgoing MV 20 KV SwitchGear
Incoming MV 20 KV SwitchGear
PT BUS MV 20 KV SwitchGear
Oux Travo 20 KV SwitchGear
Interface LV SwitchGear
LV SwitchGear
Main Distribution
Panel Battery and Charger 24 VDC
Lighting Panel
NGR 20 KV Outdoor
KWH Panel
Installation, Testing and Commissioning
|
27
|
PT.Rimau Elektrik
|
PLTU Tamiyang 2 x 3 MW
|
Metal Clad Out Going 20kV
Metal Clad Incoming 20kV
KWh Panel
Battery and Charger
Lighting Panel
NGR
Installation, Testing and Commissioning
NGR
Installation, Testing and Commissioning
|
28
|
PT.Zug Industry
|
PLTU Tamiyang 2 x 3 MW
|
Generator Control Panel 2 x 350 kVA
LV SwitchGear
Testing and Comissioning (20kV, 6.6 kV swgr) consist of 12 switchgear
Installation, testing and commisioning
|
29
|
PT. Andys Kencana
|
Gedung Senat Unibraw
|
Ligthing Protection
Distribution Board
Fire Alarm
CCTV
Lighting Panel
installation, and commisoning
|
30
|
PT. ZUG Industry
|
PLTU Sangau 2 x 7MW
|
Fire Alarm
installation and commisoning
|
31
|
PT. DSS Karawang 1
|
Power Study and Maintenance service
|
PT. DSS
PLTU 30MW
Power Study
Transient Stability and Load sheeding
Service Relay Protection & Circuit Breaker
|