ENGINEERING AND SERVICE
Design and Consultancy
Feasibility Studies
Technical Services
Substation and Powerplant condition assessments and surveys
Building Services
Design/Specifications and project management for commercial and industrial installations
Earthing Design and Transient Analysis
Electrical interference studies with other services
Power Quality
Protection
Protection scheme design and specification for Generation, Transmission and Distribution systems
Power System Analysis
Full range of power system analysis studies ( Load Flow, Short Circuit, Harmonic, Protection Co-ordination, Dynamic Stability)
PROJECT REFERENCE
No | Customer | Project | Description of Scope |
1 | PT DSS KARAWANG 1 | Power System Study |
|
|
| PT. DSS Karawang 1 (member of APP-Sinar Mas Group) is coal power plant which supply electricity to Pindo Deli (paper mills plant) around 30MW, syncronizing between power plant and PLN to be done through power transformer 3 x 50MVA, 70/20kV
|
|
2 | Rimau Electric | Power System Study |
|
|
| PT. Rimau Electric is owner of coal power plant at tamiyang Kalimantan Tengah which supply electricity to PLN 2 x 3.5MW, synchronizing with PLN at 20kV feeder |
|
3 | PT Indokomas Buana Perkasa | Power System Study |
|
|
| PT. Indokomas is contractor of coal power plant 2 x 7MW at Berau Kalimantan Timur which supply electricity to PLN, synchronizing with PLN at 20kV |
|
4 | PT Arena Maju Bersama | Power System Study |
|
|
| PT Arena is owner of coal bed methane genset power plant 10 x 700kW at Tayan-West Kalimantan which supply electricity to PLN, synchronizing with PLN at 20kV |
|
5 | PT Bayu Bumi Gemilang | Power System Study |
|
PT. Bayu Bumi Gemilang is owner of gas engine power plant which supply electricity to PLN and Industrial customer at Belimbing Bontang, 4 x 2MW, synchronizing with PLN at 20kV |
| ||
6 | PT Bayu Bumi Gemilang | Power System Study |
|
|
| PT. Bayu Bumi Gemilang is owner of gas engine power plant which supply electricity to Industrial customer at Gresik, 4 x 2MW, synchronizing with PLN at 20kV feeder |
|
7 | PT Garuda Maintenance Facility | Power System Study |
|
|
| PT Garuda indonesia facility is owner of maintenance facility is owner of maintenance facility of air plane at Cengkareng Soekarno Hatta airport, the distribution system using medium voltage system 20kV from PLN |
|
8 | PT Hasta Prajatama | Power System Study |
|
|
| PT. Hasta Prajatama is contractor of mycrohidro powerplant 3 x 3MW at Cilaki 2 West Java which supply electricity to PLN, synchronizing with PLN at 20kV feeder |
|
9 | PT Bina Guna Kimia | Power System Study |
|
|
| PT. Bina Guna kimia (FMC group) is owner of fertilize plant at semarang central java, the plant distribution system (1MVA) using medium voltage system 20kV from PLN, and low voltage 400V system |
|
10 | PT Indo Korsa | Power System Study |
|
|
| PT Indo Korsa is owner of tire plant at citereup west java, the plant distribution system (20MVA) using meium voltage |
|
11 | PT ASUKA Engineering Indonesia | Power System Study |
|
PT. Hasta Prajatama is contractor of oxygen plant at cilegon west java which have power distribution around 40MVA, Using 11kV and 400V power distribution |
| ||
12 | AKUO Energi Indonesia | Power System Study |
|
|
| Akuo Energy Indonesia as a leading company in renewable energy technology industry is planning to interconnect its generated electricity from the Solar PV Power Plant to the national grid (PLN). |
|
13 | PT ASUKA Engineering Indonesia | Power System Study |
|
|
| Power assessment in PT Cargill Serang Plant |
|
14 | Suveiyor Indonesia | Power System Study |
|
|
| PT Antam 2 x 30 MW CFPP Antam Pomalaa |
|
15 | PT ASUKA Engineering Indonesia | PT Holcim | Testing and calibration protection relay and KWh meter |
16 | PT Industira | PLTMH Cirompang | Design and manufacturing neutral grounding Transformers |
17 | PT Indokomas Buana Perkasa | PLTU Berau | Design and manufacturing neutral grounding Transformers |
18 | PT Cyma Engineering Indonesia |
| LV main distribution and lighting panel |
19 | Sinohydro | PLTA Jatigede | Manufacture lighting pole and transmission pole installation |
20 | PT Navitas |
| Design and manufacturing neutral grounding Resistor |
21 | PT. SINAR BAHANA MULYA | CITRA GREND CIPUTRA GROUP | Installation cable gardu LNK AND SUPLAY KABEL |
22 | PT. ELEKTRINDO UTAMA INDONESIA | SIEMENS | Power Study and Relay Coordination Report |
23 | PT. BBRI | PT. BBRI | Maintenane MCC, Switchgear and motor |
24 | PT. SECAR TECHNO | PT. SECAR TECHNO | Maintenance Magnetblast Breaker |
25 | PT. WIJAYA KARYA | Power System Study |
|
26 | PT.Arena Maju Bersama
| PLTGB TAYAN Kalimantan Barat 9 x 1000 KVA
| Outgoing MV 20 KV SwitchGear Incoming MV 20 KV SwitchGear PT BUS MV 20 KV SwitchGear Oux Travo 20 KV SwitchGear Interface LV SwitchGear LV SwitchGear Main Distribution Panel Battery and Charger 24 VDC Lighting Panel NGR 20 KV Outdoor KWH Panel Installation, Testing and Commissioning |
27 | PT.Rimau Elektrik
| PLTU Tamiyang 2 x 3 MW
| Metal Clad Out Going 20kV Metal Clad Incoming 20kV KWh Panel Battery and Charger Lighting Panel NGR Installation, Testing and Commissioning NGR Installation, Testing and Commissioning |
28 | PT.Zug Industry
| PLTU Tamiyang 2 x 3 MW
| Generator Control Panel 2 x 350 kVA LV SwitchGear Testing and Comissioning (20kV, 6.6 kV swgr) consist of 12 switchgear Installation, testing and commisioning |
29 | PT. Andys Kencana
| Gedung Senat Unibraw
| Ligthing Protection Distribution Board Fire Alarm CCTV Lighting Panel installation, and commisoning |
30 | PT. ZUG Industry
| PLTU Sangau 2 x 7MW
| Fire Alarm installation and commisoning |
31 | PT. DSS Karawang 1
| Power Study and Maintenance service
| PT. DSS PLTU 30MW Power Study Transient Stability and Load sheeding Service Relay Protection & Circuit Breaker |
Untuk keterangan lebih lanjut, silahkan download PDF ini :